Overhead cranes—often called bridge cranes—are the quiet workhorses that keep heavy industry moving. This long-form walkthrough follows the journey from bare runways to a commissioned crane ready for service. We’ll cover structural checks, safety, and QA/QC—all explained in clear, real-world language.
Bridge Crane Basics
An overhead crane rides on parallel runways anchored to a building frame, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: long-travel along the runway.
You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
What This Install Includes
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: power supply, festoon or conductor bars.
Stops, bumpers & safety: overload protection, e-stops.
Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.
Make-Ready & Surveys
A clean install is mostly planning. Key bim 5d steps:
Drawings & submittals: Freeze the GA and verify reactions with the structural team.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Check baseplates, grout pads, and anchor torque.
Power readiness: Lockout/tagout plan for energization.
Staging & laydown: Mark crane components with ID tags.
People & roles: Brief everyone on radio calls and stop-work authority.
Tiny survey errors balloon into hours of rework. Measure twice, lift once.
Alignment That Saves Your Wheels
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.
End stops & buffers: Verify clearances for bumpers at both ends.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Log final numbers on the ITP sheet. Correct now or pay later in wheel wear and motor overloads.
Putting the Span in the Air
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
Rig the bridge girder(s) and make the main lift.
Use drift pins to align flange holes; torque to spec.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.
Cross-Travel Setup
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Check overload/SLI and emergency stop.
Cross-travel adjustment: Verify end stops and bumpers.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.
Electrics & Controls
Power supply: Conductor bars with collectors or a festoon system.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Secure junction boxes; label everything for maintenance.
Commissioning crews love clean labeling and clear folders. Photos of terminations help later troubleshooting.
Trust but Verify
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Re-check after 24 hours if required.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Document bump tests.
Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.
A tidy databook speeds client acceptance.
Proving the System
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
When the logbook is clean, the crane is officially in service.
Everyday Heavy Lifting
Construction & steel erection: handling long members safely.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: large part transfer.
Warehousing & logistics: bulk material moves with minimal floor traffic.
Floor stays clear, production keeps flowing, and precision goes up.
Controls that Matter
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: test before touch every time.
Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.
Runway integrity: regular runway inspection plan.
Duty class selection: overspec when uncertainty exists.
Safety isn’t a stage—it's the whole show.
If It Doesn’t Run Smooth
Crab angle/drift: re-check runway gauge and wheel alignment.
Hot gearboxes: misalignment or over-tight brakes.
Rope drum spooling: check fleet angle and sheave alignment.
Pendant lag or dropout: shield noisy VFD cables.
Wheel wear & rail pitting: lubrication and alignment issues.
A 10-minute weekly check saves days of downtime later.
Quick Answers
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Span and duty class usually decide.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Why Watch/Read This
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.
Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?
Get the toolkit now and cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.
...